Why sizing comes before design
Many Saudi healthcare projects start with a plot and a floor area, and the services are fitted in afterwards. The result is often a building with too many inpatient beds and too few of the rooms that earn money and relieve pressure: day-surgery spaces, imaging, outpatient clinics. Capacity planning reverses the order. It starts from demand by service line and works out the rooms each service needs, then hands that to the design team.
What we plan
Service mix
Which specialties to open with, which to add later, and which to leave to nearby providers or a referral agreement. Gaps differ by city: Knight Frank points to unmet demand for long-term care, rehabilitation and diagnostics [1], while private operators already run about two thirds of Jeddah's inpatient capacity [2].
Activity to rooms
Expected admissions, day cases, outpatient visits and scans by service line, converted into beds, theatres, procedure rooms, imaging rooms and clinic rooms using stated occupancy, length-of-stay and session assumptions.
Phasing
What to build and fit out on day one, what to shell for later, and the occupancy or activity level that should trigger each next phase.
Workforce
Staff numbers by role for each phase, checked against the Saudisation rates that apply to those roles [3] [4] and against how hard each role is to recruit.
Licensing fit
Whether the planned facility type and services sit within one MoH licence category, and what each category requires. The Ministry's investor guide, for example, requires a qualified Saudi medical director and a Saudi managing director for a hospital [5].
Working with your design team
We are planners, not architects. The capacity plan becomes a functional brief: a schedule of departments and key rooms, the relationships between them, and the expansion each needs. Your architect and medical equipment planner take it from there, and we review their layouts against the brief before the design is fixed. The Ministry's licensing guide asks investors to submit the final architectural design as part of the hospital licence [5], so it pays to get the brief right first.
What you receive
- A capacity plan by service line and phase, with every assumption stated.
- A functional brief for the design team.
- A staffing plan by role and phase.
- A review of the concept design against the brief.
Questions we're asked
Do you design the building?
No. We set out what the building has to contain and review the design against it. Architecture, engineering and equipment planning stay with your design team.
Can you re-plan an existing facility?
Yes. Expanding or converting a facility is a common case, for example adding day surgery or turning wards into long-term care beds.
Which standards do you use?
Activity and occupancy assumptions are set out in the plan and agreed with you. We check the plan against the MoH licensing requirements for the facility type.
Sources
- Arabian Business, Saudi Arabia faces 15,300-bed hospital shortfall as healthcare investment opportunity surges (Knight Frank)
- Knight Frank, Jeddah Healthcare Report 2025
- Argaam, HRSD Ministry decides to raise Saudization rates in 269 private sector professions, January 2025
- Arab News, First phase of Saudization in healthcare professions starts today, April 2025
- Ministry of Health, Healthcare Investor Licensing Guide