Saudi Healthcare Planning

Service and capacity planning

Which services a facility should offer, in what order, and how many beds, theatres, imaging rooms and clinic rooms each one needs, so the building is designed around the demand rather than the plot.

At a glance

  • For: operators, investors, developers
  • Output: capacity plan and functional brief
  • Phasing and expansion space
  • Works with your architect
  • Fixed fee agreed after a scoping call

Why sizing comes before design

Many Saudi healthcare projects start with a plot and a floor area, and the services are fitted in afterwards. The result is often a building with too many inpatient beds and too few of the rooms that earn money and relieve pressure: day-surgery spaces, imaging, outpatient clinics. Capacity planning reverses the order. It starts from demand by service line and works out the rooms each service needs, then hands that to the design team.

What we plan

Service mix

Which specialties to open with, which to add later, and which to leave to nearby providers or a referral agreement. Gaps differ by city: Knight Frank points to unmet demand for long-term care, rehabilitation and diagnostics [1], while private operators already run about two thirds of Jeddah's inpatient capacity [2].

Activity to rooms

Expected admissions, day cases, outpatient visits and scans by service line, converted into beds, theatres, procedure rooms, imaging rooms and clinic rooms using stated occupancy, length-of-stay and session assumptions.

Phasing

What to build and fit out on day one, what to shell for later, and the occupancy or activity level that should trigger each next phase.

Workforce

Staff numbers by role for each phase, checked against the Saudisation rates that apply to those roles [3] [4] and against how hard each role is to recruit.

Licensing fit

Whether the planned facility type and services sit within one MoH licence category, and what each category requires. The Ministry's investor guide, for example, requires a qualified Saudi medical director and a Saudi managing director for a hospital [5].

Working with your design team

We are planners, not architects. The capacity plan becomes a functional brief: a schedule of departments and key rooms, the relationships between them, and the expansion each needs. Your architect and medical equipment planner take it from there, and we review their layouts against the brief before the design is fixed. The Ministry's licensing guide asks investors to submit the final architectural design as part of the hospital licence [5], so it pays to get the brief right first.

What you receive

  • A capacity plan by service line and phase, with every assumption stated.
  • A functional brief for the design team.
  • A staffing plan by role and phase.
  • A review of the concept design against the brief.

Questions we're asked

Do you design the building?

No. We set out what the building has to contain and review the design against it. Architecture, engineering and equipment planning stay with your design team.

Can you re-plan an existing facility?

Yes. Expanding or converting a facility is a common case, for example adding day surgery or turning wards into long-term care beds.

Which standards do you use?

Activity and occupancy assumptions are set out in the plan and agreed with you. We check the plan against the MoH licensing requirements for the facility type.

Tell us about your project

A few lines is enough. We'll come back with a few questions, then arrange a call to agree the scope.

Email hello@saudihealthcareplanning.com

We sign an NDA, yours or ours, before we receive any confidential information. Please keep the first message general: facility type, city and timing.

We use what you send only to reply to your enquiry. See our privacy notice.