Saudi Healthcare Planning

Healthcare planning for master developers and giga-projects

What health services a new district, city or destination needs, when each one has to open, how much land to reserve, and how to bring in operators who will run them.

At a glance

  • Healthcare strategy for a master plan
  • Phasing against population
  • Land and plot reservation
  • Operator search and terms
  • Residents, workers and visitors

Why healthcare sits in the master plan

Large Saudi developments now treat health services as part of what makes a place work, not an add-on. Red Sea Global launched its own healthcare brand, Red Sea Health, planning two hospitals, six pharmacies and an emergency medical service across its destinations [1]. The Red Sea Hospital, developed by Red Sea Global and operated by Dr Sulaiman Al Habib Medical Group, was opened by the Minister of Health in September 2026 [2]. In Riyadh, New Murabba's first investment package under its master plan was an agreement with Almana Medical Group for a general hospital [3].

The questions a developer has to answer

Who will use it

Residents, the workforce building and running the project, and visitors each need different services. The Red Sea's Coastal Village hospital was planned for a community of 14,000 people working on and around the site [4], long before most visitors arrived.

What and when

Which services each phase needs, from occupational health and urgent care during construction, to primary care and a polyclinic as residents arrive, to a hospital once the population supports one. Opening too early leaves a facility empty. Opening too late slows sales and leasing.

How much land

Plots for each facility type, with room to expand, placed where patients and ambulances can reach them, and reserved before the land is sold for other uses.

Who builds and runs it

Whether the developer builds and leases, invites an operator to build, or contracts an operator to run a developer-owned facility. Dr Sulaiman Al Habib, for example, signed five-year operation and maintenance contracts for hospitals at The Red Sea and AMAALA [5]. Each route shifts cost and risk between developer and operator.

How the work fits your programme

A healthcare strategy is most useful when the master plan is still being drawn and plots are still being allocated. We work with your planners and investment team to turn population projections into a phased list of facilities and land, then support operator search with the demand and capacity evidence operators will ask for. Later phases can be re-planned as actual population and visitor numbers come in.

What you receive

  • A healthcare strategy for the master plan: services, facilities and phasing.
  • Land and plot requirements for each facility.
  • Delivery and operating options compared, with what each means for the developer.
  • An information pack for operators, and support through operator selection.

Questions we're asked

Do you run the operator tender?

We support it: we prepare the demand and capacity evidence, help set the terms you ask operators to respond to, and help compare their proposals. Contracts stay with your lawyers.

Can you plan healthcare for workers during construction?

Yes. Early phases often need occupational health, urgent care and emergency cover long before residents arrive, and they belong in the same plan.

Tell us about your project

A few lines is enough. We'll come back with a few questions, then arrange a call to agree the scope.

Email hello@saudihealthcareplanning.com

We sign an NDA, yours or ours, before we receive any confidential information. Please keep the first message general: facility type, city and timing.

We use what you send only to reply to your enquiry. See our privacy notice.